PROJECT OVERVIEW

A 34-mile regional expressway connecting Sacramento’s growing communities.

Overwhelmingly approved in 2004 by Sacramento County voters

The Capital SouthEast Connector is a planned regional expressway linking Interstate 5, Highway 99, State Route 16, and Highway 50 across five member jurisdictions. Formed as a Joint Powers Authority in 2006, the project has delivered 11 miles of expressway and two highway interchanges to date, with construction underway on additional segments.

The Route

A 34-mile corridor across five jurisdictions.

The Connector follows a 34-mile arc across the southern and eastern edge of the Sacramento region, running from Interstate 5 in Elk Grove, east along Grant Line Road through Sacramento County, to Highway 50 in El Dorado County. Each of the three corridor segments — Kammerer Road, Grant Line Road, and White Rock Road — its respective member jurisdiction and advances independently as funding and design mature.

Kammerer Road

6 miles · I-5 to Hwy 99
City of Elk Grove

Grant Line Road

19 miles · Hwy 99 to White Rock Road
Sacramento County, City of Elk Grove, City of Rancho Cordova

White Rock Road

9 miles · Grant Line to Hwy 50
Folsom and El Dorado County

Where we are at

Delivering the Connector, segment by segment.

The Connector is a long-term, multi-phase build, advanced as funding, design, and partnerships align. The project is tracked across three stages: what is complete and open today, what is underway and anticipated to open by 2030, and what is planned for delivery after 2035.

Project at Glance
34 
Mile Expressway
11 
Miles Completed
2 
Interchanges Completed
5 
Member Jurisdictions
$230M 
Constructed Improvements
$25M 
RAISE Grant Secured
STAGE 1 • ONGOING

Complete and open now

11 miles delivered to date

Six completed roadway segments and two highway interchanges, delivered over two decades of regional partnership.

  • 2023: Kammerer Road Reconstruction
  • 2023: Grant Line Road Widening (Waterman to Bradshaw)
  • 2023: Scott Road Realignment
  • 2023: White Rock Road Phase 1 (Prairie City Rd to E. Bidwell St)
  • 2018: White Rock Road (Grant Line Rd to Prairie City Rd)
  • 2015: Hwy 50/White Rock Road/Silva Valley Parkway Interchange
  • 2015: Grant Line Road UPRR Overhead
  • 2009: Hwy. 99/Kammerer Road/Grant Line Road Interchange
STAGE 2

Underway, anticipated by 2030

Three active projects

Designed and construction-ready. Each segment is advancing toward groundbreaking as funding is finalized.

See Details
STAGE 3

Planned for delivery after 2035

Completing the full corridor

The remaining improvements required to complete the 34-mile expressway, advancing as regional funding and planning align.

See Details
Corridor Deep-Dives

Explore each segment of the corridor.

The Connector corridor is divided into three named segments, each with its own design standards, construction timeline, and funding status. The summaries below detail what has been completed, what is actively under construction, and what remains in planning across Kammerer Road, Grant Line Road, and White Rock Road.

Kammerer Road
Partnership lead: City of Elk Grove

Connecting I-5 to Highway 99 in Elk Grove.

Kammerer Road links Interstate 5 to Highway 99 across the southern end of the Connector corridor, providing regional access for freight, commuters, and emergency response. The reconstructed segment was completed in 2023, with a three-mile extension now being designed and moving towards construction ready.

Length
6 miles
Endpoints
I-5 ↔ Hwy 99
Status
2 complete, 1 active
2023

Kammerer Road Reconstruction (Bruceville Rd to Hwy 99)

Completed
2009

Hwy 99/Kammerer Rd/Grant Line Rd Interchange

Completed
ACTIVE PROJECT
Kammerer Road Extension

A 3 mile extension, fully is being designed with a $170 million construction budget. The segment is currently acquiring right-of-way and seeking construction funding.

Kammerer Road, looking east from the I-5 interchange
 
UPRR Overhead structure on Grant Line Road, completed 2015
Image 2
Image 3
 
Grant Line Road
Partnership Lead: Sacramento County, City of Elk Grove, City of Rancho Cordova

The 19-mile stretch from Highway 99 to White Rock Road.

Grant Line Road runs 19 miles from the Highway 99 interchange east to White Rock Road. It is the longest stretch of the Connector corridor, carries significant regional freight, and spans multiple member jurisdictions. Two segments are complete, one is in active delivery, and the remaining 14 miles are in long-term planning.

Length
19 miles
Endpoints
Hwy 99 ↔ White Rock Road
Status
2 complete, 1 active, 1 future
2035+

Grant Line Road, Bradshaw to Douglas (14 miles)

Future
2023

Grant Line Road Widening (Waterman to Bradshaw)

Completed
2015

Grant Line Road UPRR Overhead

Completed
ACTIVE PROJECT
Grant Line Road Safety and Freight Mobility

A 3.6-mile safety and freight mobility upgrade, budgeted at $55 million. The project is actively acquiring right-of-way and is seeking construction funding.

White Rock Road
Partnership Lead: Folsom and El Dorado County

Connecting Grant Line Road to Highway 50.

White Rock Road links Grant Line Road to Highway 50 through Folsom, and El Dorado County. With four completed segments, including the Hwy 50/White Rock Road/Silva Valley Parkway Interchange, it is the most fully delivered portion of the Connector to date.

Length
9 miles
Endpoints
Grant Line ↔ Hwy 50
Status
4 complete, 1 active
2023

Scott Road Realignment

Completed
2023

White Rock Road Expressway Phase 1 (Prairie City Rd to E. Bidwell St)

Completed
2018

White Rock Road (Grant Line Rd to Prairie City Rd)

Completed
2015

Hwy 50/White Rock Rd/Silva Valley Pkwy Interchange

Completed
ACTIVE PROJECT
White Rock Road Expressway Phase 2 (E. Bidwell to Latrobe)

A 2.5-mile reconstruction, budgeted at $40 million. This segment connects the existing completed portions in Folsom and El Dorado County, completing White Rock Road as a continuous regional expressway.

 
Community Support

Support from across the region.

The Connector advances through sustained partnership with federal, state, tribal, and local leaders across the Capital Region.

FEDERAL
Senator Alex Padilla
U.S. Senate, California
Rep. Ami Bera
U.S. House, CA-6
Rep. Doris Matsui
U.S. House, CA-7
Rep. Kevin Kiley
U.S. House, CA-3
STATE OF CALIFORNIA
Senator Angelique Ashby
California State Senate
Assemblymember Heath Flora
California State Assembly
Senator Marie Alvarado-Gil
California State Senate
Senator Roger Niello
California State Senate
Assemblymember Josh Hoover
California State Assembly
Assemblymember Stephanie Nguyen
California State Assembly
Assemblymember Joe Patterson
California State Assembly
TRIBAL, PUBLIC SAFETY & BUSINESS PARTNERS
Wilton Rancheria
Sovereign tribal nation
Sacramento County Sheriff’s Office
Law enforcement
Sacramento Metro Fire District
Emergency services
Sacramento County Office of Emergency Services
Rancho Cordova Chamber of Commerce
Elk Grove Chamber of Commerce
Folsom Chamber of Commerce
Sacramento Metropolitan Chamber of Commerce
Transparency & Governance

Built on public oversight.

The Capital SouthEast Connector is delivered by a Joint Powers Authority formed in 2006 by five member jurisdictions. Public funds are tracked against project milestones, board meetings are open to the public, and financial reporting is published on a regular cycle.

2002

SACOG completes the Route Study, identifying the potential alignment for a regional expressway

2004

Project placed before voters via Measure A, and approved by 75% in Sacramento County

2006

Connector JPA formed by five member agencies

2011

Programmatic EIR Approved

2014

Adopted into Sacramento County General Plan

Today

11 miles open, $230M invested, $460M remaining

GFOA Distinguished Budget Presentation Award

Recognized by the Government Finance Officers Association for budget transparency and clarity in FY 2024/2025.

Open public board meetings

All JPA board meetings are open to the public. Agendas, materials, and recordings are published on the Board Meetings page.

View Board Meetings

Fund Balance Reserve established

In May 2024, the JPA Board formalized a Fund Balance Reserve policy to ensure continuity of operations across funding cycles.

Formation Documentation

The founding legal, governance, and planning documents behind the Connector. Click any document to view or download the full PDF.

Joint Exercise of Powers Agreement

Executed December 12, 2006. The founding agreement that established the Elk Grove – Rancho Cordova – El Dorado Connector Authority across five member jurisdictions and defined its powers to plan, design, finance, and construct the Connector.

Bylaws

The operating rules governing the Authority's Board procedures, quarterly meetings, officer roles, and internal governance. Board meetings are conducted under the Ralph M. Brown Act.

Sacramento County General Plan Circulation Element Amendment

Adopted May 28, 2014 by the Sacramento County Board of Supervisors (Resolution 2014-0397). Incorporates the Capital SouthEast Connector into the County's General Plan, with updates to the Transportation Plan, Circulation Element, Bikeway Master Plan, Delta Protection Element, and Open Space Element.

Project Design Guidelines

Version 4.0, adopted February 13, 2015. The engineering and design standards that shape the corridor's construction, including expressway geometry, access control, interchanges, and cross-section elements. Approved by all five member jurisdictions.

Project Status

The road ahead.

The Connector has delivered 11 miles of regional expressway and leveraged more than $230 million in public investment to date. Completing the remaining 23 miles requires closing a $460 million funding gap and navigating persistent challenges around regional planning, multi-jurisdictional coordination, and shifting costs. Here's how the JPA is responding, and what's ready to build the moment funding lands.

Kammerer Road Extension
$170M · Construction Need
Expressway Road Safety and Freight Mobility
$55M · Construction Need
White Rock Road Phase 2 (E. Bidwell to Latrobe)
$40M · Construction Need
Remaining to complete the corridor
$0M
Featured Media & Resources

Inside the Connector

Back to Resources
In The Media
3:53 min
Step to the Future with Congressman Ami Bera

Go behind the scenes of the Connector project, from engineers and contractors to community leaders and elected officials.

Podcast
EP 26
40 min
Why Sacramento Must Think Like One Region (James Corless)
Guest
James Corless
Back to Resources
Podcast
EP 26
40 min
Why Sacramento Must Think Like One Region (James Corless)
Guest
James Corless